Skip directly to content

Emergency towers and temporary solutions for the continuity of overhead lines

Robust, flexible solutions for temporary operation and securing high-voltage lines.

Cteam technician working on a power transmission pylon construction.
Cteam experts performing high-voltage power line infrastructure services and maintenance on a tower.

Temporary installations for the continuity of overhead networks

In order to guarantee the stability of the network and the safe operation of overhead lines, particularly in the event of damage or during scheduled works, temporary installations are a key element of service continuity. They provide a reliable temporary solution for replacing damaged pylons or maintaining the power supply by means of temporary cable sections. For this purpose, CTEAM offers a specially developed modular system that enables fast, efficient and safe installation in the field. CP temporary devices are designed for voltage levels ranging from 110 kV to 380 kV and can be adapted to different tower head configurations. One of the key features of these solutions is the overload principle, which allows great flexibility of installation and adaptation to different types of soil, without the need for foundation work or anchoring devices, while guaranteeing the stability of the temporary structures.
_1TR4875

Key benefits of CP solutions

Features

Thanks to their modular design, CP temporary solutions can be adapted to all common pylons without the need for anchoring, guaranteeing minimum space requirements.

Voltage levels

CP temporary devices are designed for voltage levels between 110 kV and 380 kV, guaranteeing broad compatibility with high-voltage overhead networks.

Quick assembly

The installation of a temporary CP system generally takes between 1 and 3 days, depending on the complexity of the conditions encountered on site.

Sustainable use

Although designed for temporary use, CP solutions can be implemented on a temporary or permanent basis, depending on the needs of the project.

Flexible integration of existing towers

The lower parts of CP solutions are designed to allow existing pylons to be taken over or new pylons to be installed, depending on project requirements.

Scope of services

Thanks to its emergency pylon solutions, CTEAM offers reliable and recognised solutions for various fields of application in the construction and operation of overhead lines

e-technik
Damage
Rapid restoration of the power supply following damage caused by climatic events, major incidents or the failure of a pylon, to ensure continuity of service in complete safety.
baustelleneinrichtung
Conversion and renovation
For use during planned conversion work on existing overhead lines, as a bypass solution to free up construction site areas
provisorische leitungsverbindungen
New buildings
Temporary routing of lines as part of new construction projects or the replacement of existing structures
Genehmigungen, Kalkulationssicherheit
Mission planning
Logistics service for optimised planning of your temporary modules.

CP solutions in detail

CTEAM's CP solutions are available in several versions to meet the different requirements of overhead line construction. Each solution has specific features adapted to the constraints of the project.

Bild1

CP-Light

Electrical circuits

2 x 110 kV

Wiring

Al/St 265/35 (264-AL1/34-ST1A)

Beam

Single cable

Average traction voltage

43 N/mm² of water

Phase amplitude

400 m

Deadweight coefficient

min/max 100 m/500 m

Wind/ice zone*/**

Wind zone 2 / Ice zone 2

CP

Electrical circuits

1x 380 kV

Wiring

Al/St 265/35 (264-AL1/34-ST1A)

Beam

4-conductor bundle

Average traction voltage

43 N/mm² of water

Phase amplitude

400 m

Deadweight coefficient

min/max 100 m/500 m

Wind/ice zone*/**

Wind zone 2 / Ice zone 2

CP-Heavy

Electrical circuits

2 x 380 kV

Wiring

Al/St 265/35 (264-AL1/34-ST1A)

Beam

4-conductor bundle

Average traction voltage

43 N/mm² of water

Phase amplitude

400 m

Deadweight coefficient

min/max 100 m/500 m

Wind/ice zone*/**

Wind zone 2 / Ice zone 2

CP lower section suitable for retrofitting existing pylons

Suitable for reusing existing pylons.

*Subject to compliance with the basic static dimensions, the CP solution can also be used with other cable sections or in areas subject to different wind and ice conditions.

**Full rated load capacity: no standard reduction in wind or ice loads is applied. However, specific adaptations can be defined according to project requirements.

20191106-DSC08133
160119_cteam_014
160114_cteam_096
160119_cteam_296
Provisorien
Provisorien
Cteam CP-30
Download brochures

Download our temporary solutions brochure in PDF format.

Other Cteam services

To help you realise your projects, we offer tailor-made solutions covering a range of specialist areas. Thanks to our technical expertise and personalised approach, we can provide efficient, reliable and high-quality support at every stage.